Skip to content
Full ThrottleEarthworks

Regional build register

Put your town on the Full Throttle map.

Route priority 2 — roughly two weeks after Yass · Approx. 21 – 28 September 2026 (planned window)

Geelong is next after Yass — we're planning to swing through roughly two weeks later, so around 21 – 28 September 2026. Indicative window only, not a guaranteed arrival date. Get your property on the register and we'll confirm as the run firms up. We travel with the full setup, so we group builds by region. Get on the register and when the machines are heading your way, we’ll let you know. It’s not a booking and there’s no set route or price — it’s how we work out where the riders are.

Confirmed route

Yass first. Geelong two weeks later.

These are the only two stops on the run right now — Yass, NSW first, then Geelong, VIC roughly two weeks behind it. Both windows are planned, not guaranteed arrival dates, and nothing is locked until we publish exact dates. Surrounding regions: get on the list, near enough counts.

Route priority 1 — next stop

Yass, NSW

Approx. 7 – 14 September 2026 — planned window

First stop on the run. We're aiming to have the setup in the Yass region in roughly 3 – 4 weeks — around 7 – 14 September 2026. Planned window, not a guaranteed date, but if you're anywhere near Yass this is the time to get on the route.

Nearby counts: Yass, Murrumbateman, Gunning, Goulburn, Canberra, Cootamundra, Young, Queanbeyan and the surrounding country — you don't have to be in town to get on the run.

Route priority 2 — roughly two weeks after Yass

Geelong, VIC

Approx. 21 – 28 September 2026 — planned window

Geelong is next after Yass — we're planning to swing through roughly two weeks later, so around 21 – 28 September 2026. Indicative window only, not a guaranteed arrival date. Get your property on the register and we'll confirm as the run firms up.

Nearby counts: Geelong, Bannockburn, Winchelsea, Colac, Ballarat, Torquay, the Bellarine and western Victoria — near enough counts.

Where we're pointed

Regional track builds, Australia wide.

NSW and Victoria are the next priority regions. Everywhere else gets grouped as the register fills up.

NSW

New South Wales

Next route priority

Yass is stop one, roughly 7 – 14 September 2026 (planned window). Get your property, club or backyard block on the list so we know where to pull up.

VIC

Victoria

Next route priority

Geelong follows about two weeks after Yass, roughly 21 – 28 September 2026 (planned window). The more riders on the register, the tighter we can plan the run.

AU

Rest of Australia

Register by state

QLD, SA, WA, TAS, NT and ACT — register your state and nearest town and we'll group the work when we're through.

USA

United States

Future interest only

No US dates, no US route, nothing locked in. This is a future interest list only, so we can see where the demand sits.

USA is a future interest register only. Full Throttle Earthworks currently builds in Australia — no US operations, dates or availability are on offer.

Tell us where you ride.

Takes a couple of minutes. Land details are optional at this stage — we just need to know where you are and what you want to ride.

Your details
Where you ride
What you want built

Links only for now — we’ll ask for the files once we’re talking.

Timing

Registering isn’t a booking or a quote.

Got land and you’re ready to go? Request your build instead. Still shopping for a block? Send us the property.